Reconstruction of the Krasnoyarsk ship lift, unique hydraulic engineering structure allowing ships overpass water level difference below and above the Krasnoyarsk HPP, can begin in 2018, IAA PortNews correspondent cites Vladimir Baikalov, head of Yenisei Basin IWW Administration, as saying at the conference “Ensuring safety and reliability of navigational HESs” held in Krasnoyarsk.
2017 September 27
Krasnoyarsk ship lift to undergo reconstruction
Reconstruction of the Krasnoyarsk ship lift, unique hydraulic engineering structure allowing ships overpass water level difference below and above the Krasnoyarsk HPP, can begin in 2018, IAA PortNews correspondent cites Vladimir Baikalov, head of Yenisei Basin IWW Administration, as saying at the conference “Ensuring safety and reliability of navigational HESs” held in Krasnoyarsk.