• 2020 May 6 16:48

    Ailes Marines selects Van Oord for the foundation transport and installation works at Saint-Brieuc Offshore Wind Farm

    Ailes Marines, in charge of the development, construction, installation and operation of the offshore wind farm in the bay of Saint-Brieuc, has selected the Dutch marine contractor Van Oord to transport and install the 62 jacket foundations (steel lattice structure) and the foundation piles for the offshore substation.

    Van Oord will start the offshore operations in 2021 with the installation of the pin piles using its offshore installation vessel Aeolus. The Aeolus will be assisted by a second vessel in 2022 to install jackets foundations that will be manufactured in Fene, Spain and in Brest, France.

    The Aeolus, which was purposely built to construct offshore wind parks, was put into service in 2014. The main crane of the Aeolus has a lifting capacity of more than 1,600 tonnes. This makes the Aeolus suitable for the transport and installation of foundations and wind turbines. Its advanced jacking system with its four giant legs, each measuring 85 metres and weighing 1,280 tonnes, allow Aeolus to be jacked up and work in waters of up to 45 metres deep. Van Oord has been awarded an Early Works Contract as per December 2019 in order to expedite the design and engineering. Construction on the subsea drilling template has already started and is scheduled to be delivered Q4 2020.
     
    Van Oord has a long history executing a variety of projects in France. The most recent example being our involvement in the various phases of the deepening the River Seine. The Saint-Brieuc project will be our first offshore wind project in France and I’m proud of our involvement. Especially since we are delighted to have the opportunity to work with Iberdrola again. By taking on this offshore wind project, we are also contributing to the EU-wide renewable energy target of 32% by 2030.

    Saint-Brieuc Offshore Wind Farm is being constructed in the Bay of Saint-Brieuc in Brittany, 16.3 kilometres off the French coast. When finished, the wind farm with a total capacity of 496 MW will produce 1,820 GWh annually, equivalent to the annual electricity consumption of 835,000 inhabitants. The installation works will last several months and will continue until 2022. The wind farm will be fully commissioned in 2023.

    Having decided to proceed with the project, Ailes Marines is happy to sign this contract with Van Oord to transport and install the 62 jackets and the offshore substation foundation piles for the Saint-Brieuc project, that will become an important part of France’s energy transition to a green economy. Given the difficult circumstances created by the pandemic crisis, we are contributing to the recovery of industrial activity in France and the rest of Europe.

    About Ailes Marines

    Laureate for the Bay of Saint-Brieuc offshore wind farm project in April 2012, Ailes Marines is in charge of its development, construction, installation and operation of the offshore wind farm. Ailes Marines is a Simplified Joint Stock Company (SAS), held at 100% by IBERDROLA.




2024 July 26

18:00 LiqTech and Danbee Marine enter agreement for marine scrubber water treatment solutions for the South Korean market
17:23 Thecla Bodewes Shipyards successfully launches 7.280dwt vessel ‘Vertom Lisa’ for Vertom Group
16:57 MSC reaffirms pledges to avoid Arctic shipping route
16:23 Taiwanese ports resume bunkering after Typhoon Gaemi-induced suspension
15:41 Chinese ports container volume rises 8.5 % in the first half of a year 2024
15:17 Hanwha Ocean picked as preferred bidder for S. Korean Navy's logistics support ship
14:55 Vietnam's port system able to handle world's largest ships
14:36 Castor Maritime announces the acquisition of its first Ultramax vessel
14:12 Bunker price trends in the world's four largest hubs, July 22-28 – MABUX
13:30 Total Energies orders LNG bunkering vessels at Hudong Zhonghua
12:52 Philippines rushes to contain oil spill from sunken tanker
12:47 Bangladesh 'jam-packed' with cargo as curfew and internet restrictions continue
12:24 Helmerich & Payne announces agreement to acquire KCA Deutag
11:54 Two cruise ships were simultaneously bunkered with LNG at Port Canaveral
10:51 Associated British Ports announces new Chair
10:18 CMA CGM publishes Q2 2024 financial results

2024 July 25

18:00 Western sanctions and Houthi attacks boost appeal of Russia’s Arctic Sea Route - Bloomberg
17:46 Saudi Arabia imports fuel oil from Kuwait for first time in two years
17:24 Port of Thessaloniki implements the wireless reefer monitoring system
16:59 Hunan Jinhang Shipbuilding launches a 500m3 LNG bunkering pontoon
15:51 Chevron’s Taro Ultra advanced 40 granted LNG Validation status by WinGD
15:16 A Philippine-flagged tanker capsized off the coast of Bataan province, causing a spill
14:44 Cyan Renewables acquires Australian vessel operator MMA Offshore
14:23 Russia ships fuel to Bolivia as it increases Latin American sales - Reuters
13:59 Grimaldi-Minoan consortium acquires 67% of Heraklion Port Authority
13:12 Bumi Armada, Navigator Gas and Bluestreak CO2 announce MoU with Uniper for joint study on export of CO2 emissions from proposed UK carbon capture plant
12:52 ABS releases industry first advisory on ammonia bunkering
11:40 Drydocks World executes conversion and upgrade projects for FPSO and FSO vessels
11:10 EMA and MPA shortlist two consortia to further study viability of ammonia for power generation and bunkering
10:40 AW Shipping inks contract with CSSC Jiangnan Shipyard for the construction of two 93,000 cubic meters very large ammonia carriers
10:09 Corvus Energy Blue Whale ESS awarded RINA Type Approval
09:48 Opulent Maritime selects ADP Clear to digitize its bunkering operations

2024 July 24

18:00 MSC invests in multimodal terminal adjacent to Paris via MEDLOG
17:34 Frontera announces agreement between Puerto Bahia and GASCO to pursue LPG project in Cartagena, Colombia
17:00 Shipping firms respond to Houthi attacks in Red Sea
16:32 China’s shipbuilding output rises by 18.4% in H1 2024
16:04 The EU ETS to run the global tanker fleet more than €2bn by 2030
15:49 Typhoon Gaemi halts bunkering in Taiwanese ports
15:23 Container ship fleet expands by 11%, fastest growth in 15 years - BIMCO
14:55 MPC Container Ships takes delivery of final 5,500 TEU methanol-ready boxship from Korea
13:32 A methanol-powered cargo ship arrived in Estonia for the first time
13:13 Six feared dead and 14 rescued after fishing boat sinks off Falkland Islands
12:40 Wartsila to supply a hybrid-electric propulsion system for an 11,000 dwt Limestone Carrier
12:15 Rijeka Gateway adopts private 5G campus network
11:46 Valenciaport handled 2.7 million containers in H1 2024
11:24 Fincantieri signs order with Carnival Corporation for three mega-cruise ships
10:53 Energean takes FID for the Katlan development project in Israel
10:23 Australia announces three years’ worth offshore acreage for petroleum exploration and CCS
09:58 Valaris DS-17 to drill for the Raia project in Brazil

2024 July 23

18:00 Telemar to provide global safety support services to seven Ignazio Messina container vessels
17:27 KBR’s blue ammonia technology selected for Shell Blue Horizons project in Oman
17:16 The Federal Maritime Commission publishes final rule on unreasonable refusal to deal
16:42 Qatar Navigation and Qatar Steel sign a 5-year agreement to provide stevedore services
16:25 Spain detains cargo ship over fuel spill near Ceuta
15:23 The Indonesian company Pertamina adds Russian oil grades to its tender lists to buy September crude
14:58 Seatrium secures S$180 mln in repairs and upgrades projects
13:49 HD KSOE partners with UM to foster US ship engineers
13:24 IRGC seizes oil tanker smuggling fuel in Persian Gulf
11:25 ADNOC L&S joint venture awards $1.9bln contract to Chinese shipbuilder
10:59 Port of Valencia opens new combined transport terminal
10:24 NYK Bulkship installs NYK Group’s first wind-assisted ship-propulsion units
09:59 GTT entrusted by HD Hyundai Heavy Industries for the tank design of two new LNG carriers

2024 July 22

18:06 Manzhouli railway port handles 2,327 China-Europe freight train trips in 1st half of 2024
17:36 NORDEN to acquire Norlat Shipping to further grow projects and parcelling activities
17:23 2024 is expected to be a record year for cruises in the port of Heraklion
16:47 ABS and the U.S. Coast Guard Research and Development Center to collaborate on maritime technologies
15:56 Trafigura Group takes full ownership of High Heat Tankers
15:46 China delivers world’s first river-sea LNG bunker and transport vessel
14:51 Hartmann receives new LNG-powered LEG carrier
14:14 Jiangnan Shipyard supplies dual-fuel VLEC gas Huanghe