After delivery, Cidade de Niteroi MV18 will join the Petrobras fleet in the Campos Basin.
The work scope for this VLCC conversion included repair & life extension, specialist FPSO structure construction, topsides module installation and integration, fitting of steel structure, cable pulling, and piping work.