The SK4902/10021 Project ship was designed by Skipskonsulent AS (Bergen, Norway). LOA - 47.85 m, width - 10 m, depth - 4 m, draft – 2.85 m, 850 DWT. The volume of cargo tank is 750 m3. The vessel is designed for transportation of light and dark oil (flashpoint above 60C) and bunkering of vessels.
According to Mr. Bazhenov the Nevsky’s portfolio of orders does not include any bunkering vessel. However, when MARPOL Convention requirements come into force in Russia the bunkering market operators will have to upgrade their fleets. That means more contracts for the Plant.
Nevsky Shipbuilding & Shipyard LLC is located 40 km from Saint-Petersburg in Schlusselburg on the left bank of the Neva River. It is one of the oldest shipping companies in the Russia’s North-West. The Company has building ships since 1952, river and seagoing vessels of various types and purposes. Nevsky provides repairs of all ship types. Nevsky Shipyard’s slipway allows lifting and launching 140-m-long, 2.500-ton vessels.