Generally, Azerbaijan has transported 122.9 mln tonnes oil via Baku-Tbilisi-Ceyhan (BTC) pipeline since it has been launched.
Note that, BTC was launched in July, 2006. The distance of the pipeline is 1 768 km (443 km in Azerbaijan, 248 km in Georgia and 1 077 km in Turkey) and the annual transportation capacity is 50 mln tonnes.
BTC shareholders are: BP-Azerbaijan» (30,1%), AzBTC (25%), «Chevron» (8,9%), «Statoil» (8,71%), TPAO (6,53%), ENI (5%), «Total» (5%), «Itoçu» (3,4%), «Inpex» (2,5%), «KonokoPhillips» (2,5%) v? «Hess» (2,36%).