Under the first contract, GE will supply a blowout preventer (BOP) stack and controls system, to be installed on a Petroserv-owned drillship for oil and gas production activities offshore Brazil.
Besides, the company will deliver to the customer two complete drilling packages to be installed on Odebrecht Oil & Gas owned drill-ships, each including a 10,000-ft riser system and BOP stacks and controls.
GE Oil & Gas manufacturing plants in Houston, Texas, US and Singapore will jointly manufacture the equipment for these orders, with deliveries scheduled between October 2010 and November 2011.