Oil terminal of Neva Pipeline Company LLC (NPC, port Ust-Luga, end point of Baltic Pipeline System-2) dispatched over 12.7 mln t of cargo from the start of the year and 50.341 mln t from March 23, 2012, when it commenced operation, the Company’s press center says.
The milestone of 50 mln was passed on July 17, 2014 with loading of tanker SN Olivia with over 100,000 t of Rosneft oil.
On July 19, 2014, the terminal of Neva Pipeline Company LLC completed handling of its 500th tanker, Stena Atlantica (flag of Cayman Islands). Having accepted 100,000 t of KazTransOil, the vessel left for port Rotterdam.
The terminal of Neva Pipeline Company LLC at Commercial Sea Port of Ust-Luga is the end point of Baltic Pipeline System-2. The terminal was launched for startup-setup operations on March 23, 2012. The owner and operator of the oil terminal is Neva Pipeline Company LLC (NPC). 50% of the authorized capital is held by Gunvor Group, 26% - by Transneft Ust-Luga LLC (Transneft subsidiary), 24% - Gazprombank OJSC.
In 2013, NPC transshipped 23.3 mln t of oil.