1. Home
  2. Maritime industry news - PortNews
  3. Nevsky Shipyard will launch dry cargo vessel of Project RSD 49 on 29 June 2017 (photo)

2017 June 26   14:38

Nevsky Shipyard will launch dry cargo vessel of Project RSD 49 on 29 June 2017 (photo)

Nevsky Shipyard says the solemn ceremony of launching the single-deck dry cargo vessel of mixed “river-sea” navigation RSD49 project “Pola Sevastiana”, is going to take place on the slip of Nevsky Shipyard on the 29th of Juny 2017. The construction of vessel is provided by the order of LLC "Pola Rise" (Russia). The project was developed by CJSC “Marine engineering Bureau-design-SPb”.

Main dimension

Length overall, m

139.95

Length between PP, m

135.74

Breadth, m

16.50

Depth, m

6.00

Draught, m (in sea / in river)

4.70 / 3.60

Deadweight, t (in sea / in river)

7143 / 4507

Endurance, days

20

Range, nautical miles

4000

Cargo holds capacity, m³

10921

Number of holds

3

Nevsky Shipyard, LLC is located 40 km away from Saint-Petersburg in the town of Schliesselburg on the left bank of the river Neva.  The Shipyard is one of the oldest enterprises of water transport in the northwest of Russia which started its shipbuilding activity since 1952. Nowadays the Shipyard builds sea and river vessels of various types and purposes and carries out all kinds of ship repair works. The slipway for vessels rising allows to launch and lift for repairs the vessels up to 150 meters long and dock weight up to 3,800 tons.

News 2025 February 5

2025 February 4

2025 February 3