1. Home
  2. News
  3. Nantong COSCO KHI Ship Engineering completes second dry dock

2008 May 13   06:41

Nantong COSCO KHI Ship Engineering completes second dry dock

A second VLCC-capacity dock at Nantong COSCO KHI Ship Engineering (NACKS) has been completed. The yard, a joint venture between COSCO Group and Kawasaki Shipbuilding Corp, is building a 300,000 dwt VLOC in the new dock for COSCO. The dock is 500m long and 80m wide, with five cranes.

Latest news

2025 August 24

2025 August 23

2025 August 22

Mon Tue Wed Thu Fri Sat Sun
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31