The new logistics facility comprises two transit terminals: 9,200 m² is available for industrial goods and 3,800 m² for temperature-controlled foodstuffs.
There is also a 6,000 m² warehouse with 13,200 pallet spaces for correct storage of goods with different temperature ranges, enabling the Mannheim branch to provide additional scope for high-quality contract logistics services.
A two-storey admin building with more than 3,300 m² of usable space completes the logistics centre.
Dachser has also installed a photovoltaic system on the roof with a rated output of around 800 kWp.