Kalmar, part of Cargotec, has announced a large contract to heighten and extend the handling capabilities of eight ship-to-shore (STS) cranes at MSC Terminal VLC in Valencia, Spain. The order is the largest ever for Kalmar Crane Upgrades business. The project was signed into Cargotec's 2015 third quarter intake, and all cranes are scheduled to be operational by mid-2017, the company said in its press release.
MSC Terminal VLC has chosen to upgrade their STS cranes to accommodate larger vessels in anticipation of growth in container movements. The Paceco cranes are currently limited to a maximum vessel size of 16,000 TEUs. Kalmar will extend the boom on all eight cranes by six metres and heighten six of the cranes by 10 metres, increasing the terminal's capacity to serve ships carrying up to 19,000 TEU (MSC OSCAR type).
MSC Terminal VLC is a transshipment hub and distribution gateway for the Iberian Peninsula and Southern Europe, and currently handles 1.6 million TEUs annually. Kalmar has previously electrified two Terex Nöell rubber-tyred gantry (RTG) cranes in the terminal.