GTT has received an order from the Chinese shipyard Jiangnan Shipyard (Group) Co., Ltd. for the tank design of 5 new LNG-fuelled container ships of 15,000 TEU capacity each. The ships will be built on behalf of a European ship-owner and their delivery will be staggered between the second half of 2021 and the first half of 2022.
GTT will design the LNG fuel tanks, with a capacity of 14,000 m3 per ship. The Mark III Flex membrane containment system, developed by GTT, has been chosen for its space optimisation allowing a maximum usage of cargo capacity.