1. Home
  2. Maritime industry news - PortNews
  3. Tugboat RB-413 of project 90600 built by Pella Shipyard successfully passed its sea and mooring trials

2014 November 27   12:57

Tugboat RB-413 of project 90600 built by Pella Shipyard successfully passed its sea and mooring trials

The tugboat «RB-413» of the project 90600 building No 941 has successfully passed its sea and mooring trials, Pella Shipyard says in its press release.

In the nearest time the Acceptance Commission will start its work on tugboat’s delivery to the Customer.

The tugboat is intended for towing and berthing operations in harbor, roadsteads and coastal areas which comply with R3 navigation area, refloating of ships and vessels, fire fighting operations at floating and shore objects, oil and petroleum content products, cargo transportation, ice breaking and erosion operations.

Technical information:

Length max

25,4 m

Width max

8,8 m

Draught

4,2 m

Speed

11,8 knots

Classificaion

КМ  Arc4 R3 Aut3 Tug by Russian Register of shipping.

Propulsion system

Z-drives US 155, Rolls-Royce, FPP into nozzles

Powerplant

2*746 kW at 1800 r/min, Caterpillar С32

Deck equipment: bow electro-hydraulic anchor-towing-mooring winch Fluidmecanica providing 10 t of bollard pull and 847 kN of brake holding force; 23 t towing hook SWL with quick release device.

The tugboat is equipped with cargo crane РС 2300, Palfinger with lifting capacity of 150 kilos at the boom of 5m.

In order to fulfill fire-fighting operations the tugboat is equipped with external fire fighting system made by FFS (capacity is 800 m3/h, 2 water monitors, water curtains system).