Between August 10 and 16 Passenger port of Saint Petersburg has received 13 cruise ships and 32,984 passengers. The total berth time of all the ships is 25 ship-days, total amount of passenger operations – 113 655.
Services provided to ships:
• Fresh water bunkering – 2 295 m3
• Waste-water reception – 366 m3
• Garbage collection – 320 m3
In the indicated period 10 helicopters have used the helipad of Passenger port of Saint Petersburg.
Maximum amount of ships in the Port this week – 5, on August 11.
Passenger Port of Saint-Petersburg «Marine Façade» PLC is in the ownership of the city of St. Petersburg and is the largest passenger seaport in Russia. Construction of Marine Façade began in 2006. The port can accommodate cruise and ferry ships of up to 330 m long and with a draft of up to 8.8 m. The length and depth of new access channels - 10 km and 11 m, accordingly. The port operates seven piers. The quay-side length – 2,171.06 m.