MAN Energy Solutions has received an order for 3 × MAN 6L21/31DF-M (Dual Fuel-Methanol) GenSets capable of running on methanol in connection with the construction of a 7,990 dwt IMO Type II chemical bunker tanker, according to the company's release.
The dual-fuel engines will form part of a diesel-electric propulsion system on board the vessel with electrical motors driving twin fixed-pitch propellers via gearboxes; an onboard battery-storage system will optimise the use of the dual-fuelled generators. MAN Energy Solutions’ licensee, CMP – an engine-manufacturing division of Chinese State Shipbuilding Corporation (CSSC) – will build the engines in China and the vessel is scheduled for delivery during Q4, 2025.
The newbuild will operate at the port of Singapore under charter to deliver marine fuels. The port itself is reported as laying plans for the steady supply of methanol from 2025 onwards in order to meet future, anticipated bunkering requirements for methanol-fuelled vessels.