The ship cranes will be delivered during 2008–2010 for vessels ordered by Chinese COSCO, German Peter Döhle and Hong Kong based Cido Shipping. The ship cranes delivered for COSCO’s eight vessels will be of heavy lift type with 200 tonnes hoisting capacity and include double control systems as well as an auxiliary hoist for efficient handling of containers. Peter Döhle’s six container vessels will be equipped with ship cranes with a 45-tonne hoisting capacity. In addition, the ship cranes with 40-tonne hoisting capacity will be delivered for three container vessels ordered by Cido Shipping.
The ship cranes will be manufactured by MacGREGOR’s partner plants in China.