The Federal Main Department of State Expertise (Glavgosexpertiza) has issued positive conclusion on the results of ыtate expert appraisal of planning / design documentation of a shop for maintenance and primary treatment of steel and rolled metal, the hall for blasting, painting and drying of prefabricated modules, warehouses and service yards of the Far Eastern Zvezda Shipyard based in Bolshoi Kamen, Glavgosexpertiza said.
The Glavgosexpertiza experts confirmed that the submitted documents, engineering surveys and design documentation for the facilities are fully compliant with the requirements of technical regulations and other requirements, and the design documentation to the results of performed engineering survey.
The Zvezda Shipbuilding Complex is being built in the Ussuri Bay near Bolshoi Kamen Bay by a Consortium of Rosneftegaz, Rosneft and Gazprombank on the basis of the Far Eastern Shipbuilding and Ship Repair Center. The initial stage of the project first phase was launched in 2016. The completed state expert appraisal included the projects of the 6th, 9th and 13th stages of the Phase 1st.
The 6th stage includes the construction of halls for blasting, painting and drying of surface steel plates and structures of tankers, gas carriers, PSVs (to be built at Zvezda Shipyard) and of the upper structure of offshore drilling rig with the halls designed as a stand-along building while main equipment and necessary auxiliary sites to be placed in an annex to the building. The stage also includes laying of engineering network, water / heat / power supply systems, water disposal and communication networks. The construction site encompasses 2.78 hectares with the building area of 0.826 hectares.
The 9th stage of the project, reviewed by the experts of Russia’s Glavgosexpertiza. Includes the construction of a ship for steel / rolled metal surface treatment, a propane-butane gasification station, an indoor warehouse for steel plates and one - for oversized equipment, and other facilities. The land area is 7.88 hectares.
The 13th stage phase first of the Far East Zvezda Shipbuilding Complex project encompasses the construction of a maintenance workshop, warehouses and service yards, a mobile battery charging shop and other facilities. The maintenance shop is intended for inspection, survey and repair of machinery, equipment, vehicles, control and maintenance of propulsion units, engineering systems, etc.